Due to the distinct mechanical and physical properties of PVC and its use in the most difficult operating conditions, there are certain points that are very important to pay attention to during the life of the products, including the design of a piping system according to the latest standards and techniques. pipe production to achieve a coherent and acceptable system, which is considered only half of the work, we can also mention the transportation, storage, installation and correct implementation of pipes. The other half of it includes the proper installation or implementation of this system in the project environment.
When there is water inside the excavated ground for the implementation of pipelines, it is necessary to avoid doing embankment operations on the pipe, and it is possible to use a sludge pump, special nylons, drainage pipes, or gravel layers with suitable thickness to exit and Used to control water in the ground.
If the bed floor is made of stone or similar hard materials or stones with dimensions greater than 40 mm, it should be excavated at least 150 mm below the bottom of the pipe and filled again with suitable sand materials.
After placing the pipe in the bed, it should be ensured that the pipe is completely fixed in place and the soil around it is solid and cannot fall.